AI Summary
Description
This is a combined synopsis/solicitation for a commercial product prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12 and RFO Subpart 5.2 . This announcement constitutes the only solicitation; quotes are being requested.This requirement incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2026-01. Requirement Description The U.S. Forest Service, Gifford Pinchot National Forest, Wind River Ranger District, requires the procurement of a brand new, commercial-grade Fire Trailer Tank and Pump Assembly . Critical Procurement Constraint: The Government currently owns the tandem-axle utility trailer (5'x10', 7,000 lbs GVWR). This requirement is strictly for the fully integrated skid unit that bolts onto the existing frame. Exclusions: This acquisition explicitly does not include the purchase of a new trailer chassis, wheels, axles, tongue, or towing coupler. Technical Specifications & Salient Characteristics The skid unit must conform to the following core baselines: Tank Structure: Minimum 500-gallon capacity; heavy-duty 10-gauge carbon steel. Internal anti-surge baffles and interior epoxy coating required. Footprint & Weight: Maximum 5'x10' footprint matching the structural channel layout of the government owned trailer. Total assembly dry weight must not exceed 2,300 lbs. Pump Assembly: 13 HP commercial gas engine paired with a twin-impeller portable centrifugal pump delivering ≥ 120 GPM @ 40 PSI and ≥ 20 GPM @ 146 PSI. Drafting & Plumbing: Integrated 2-inch manifold with self-loading/drafting system. Includes 2" x 20' suction hose with foot valve/strainer and a manual hand primer pump. Discharges: 2-inch quarter-turn ball valve main discharge. Valved auxiliary ports in 1-inch, 1.5-inch, and 3/4-inch configurations. Accessories: Manual-wind hose reel loaded with 250 feet of 1-inch utility hose and adjustable nozzle. Integrated lockable rear toolbox, shackle tie-down points, and integrated fenders/mud flaps matching tandem-axle placement. Aesthetics: Tank may be painted red but must not feature any fire use decals or markings. ******See Attached Solictation for Salient Characterisitcs******** Place of Performance/ Timelines Delivery/Production Timeline: Full manufacturing, plumbing, leak pressure testing, and final inspection availability must occur within thirty (30) calendar days from receipt of order (ARO). FOB Delivery Address: Wind River Work Center, 1262 Hemlock Road, Carson, WA 98610. Government Pickup Option: If the contractor's manufacturing facility sits within a 100-mile driving radius of Carson, WA (98610), the Government reserves the right to execute a local pickup. Evaluation Framework & Basis for Award Award will be made to the responsible offeror representing the most advantageous solution to the Government under the simplified procedures of FAR 12.203 . The following factors will be evaluated: Technical Acceptability: Exact matching of technical baseli…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)