AI Summary
Description
Andersen Air Force Base, Guam has a Design-Build construction requirement to design and fully repair Saipan Dorm B25007 13 Aug 25* - Amended solictiation 002 reflects the added Attachment 9a Roofing As-BUILTs posted in the Attachments/Links. 13 Aug 25* - As stated in the amended soliciation (08 Aug 25), the updated Statement of Work is posted in the Attachments/Links. 08 Aug 25* - The amended soliction to reflect the updated Statement of Work is posted along with the As-BUILTs and expanded RFI responses. 08 Aug 25* - The last round of RFIs are posted in the attachment secetion along with the As-BUILTs. The amended Statement of Work to reflect the RFI responses will be posted. 07 Aug 25* - The first round of RFIs are posted in the attachment secetion. There will be more responses posted along with an amended Statement of Work. DESCRIPTION OF WORK The contractor shall design and fully repair Saipan Dorm B25007 to renovate interiors including floors, walls, ceiling, finishes, full restroom renovation, updating code for Energy and Life Safety, exterior renovations resulting from recent storm damage. Walkway slabs and spandrel beams will be repaired. Repairs will also include a complete update to the HVAC and Plumbing systems. B25007 is conditioned by chilled water and a central chiller plant, and both will be replaced. A complete replacement of air handlers, ductwork, grilles, variable air volume boxes, and chilled water piping will be replaced. The chilled water pump will be replaced. All existing plumbing utilities will be replaced and updated. The existing heat pump water heaters will be replaced with standard electric water heaters with large storage tanks. Electrical updates include an update to the entire electrical distribution system. The system updates will include a complete replacement of electrical distribution from the pad mount transformer secondary conductors to the entire downstream building distribution system. Fire protection updates include sprinkler protection throughout, installation of a mass notification system, and a wet-pipe sprinkler system throughout the dorm. B25007 must be re-graded to maintain positive drainage away from the building. Existing storm sewer inlets buried with debris, dirt, and grass are to be cleared. MAGNITUDE FAR 36.204(h) and DFARS 236.204(ii) The magnitude of this project is between $25,000,000 - $100,000,000 LOCATION OF WORK: Andersen AFB, GU PERIOD OF PERFORMANCE 865 Calendar Days RESTRICTION TO SMALL BUSINESS: This acquisition is being competed as a Historically Underutilized Business Zone (HUBZone) Small Business set-aside. The applicable North American Industry Classification System (NAICS) code for this acquisition is 236220 Commercial and Institutional Building Construction with a small business size standard of $45 million. CONTRACT TYPE: Firm Fixed Price (FFP) SITE VISIT: Thursday, 24 July 2025 at 0900 hours ChST (See Solicitation Section L) REQUEST FOR INFORMATION: Any Requests for Informati…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (27)