Description
Notice ID: W50S77-26-Q-A001 Notice Type: Combined Synopsis / Solicitation Notice Issue Date: June 25, 2026 Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT Contracting Office: United States Property & Fiscal Office - Texas Air National Guard Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service Project Number: FWJH262710 Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034 Category: N – Installation of Equipment NAICS: 238210 – Electrical Contractors and Other Wiring Installation PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment Magnitude: Between $25,000.00 - $50,000.00 Set Aside : Total Small Business Set-Aside Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov. Scope of Work : The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list. Pre-Quote Conference/Site Visit : We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details. Due Date : Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award). Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay m…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (2)