Description
This project is a Firm-Fixed Price Design-Bid-Build construction requirement which will provide a predesigned mechanical method for dislodging debris from the trash racks at the East Fish Ladder (EFL) Auxiliary Water Supply (AWS) Backup system intake. This will remove the need for operations staff to shut down the AWSB system to let river currents clear accumulated debris from the screens.
Classification
Place of Performance
Contracting Office
Contacts