AI Summary
Description
N4008526R0151 Design Build Provide full repairs to Building 1372, Coddington Point (CP), referred to as Ripley Hall. Naval Station Newport, Newport, RI. THIS ACTION IS RESERVED FOR DESIGN-BUILD (DB)/ DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY /INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW LONDON, CT/ NEWPORT, RI AORs (CONTRACT NUMBERS N4008522D0021, N4008522D0022, N4008522D0023, N4008522D0024, N4008522D0025). FOR FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT N4008522D0022 - Armitage SAI JV N4008522D0023 - Black Horse Construction Group N4008522D0024 - CCI Facility Support Services, LLC N4008522D0025 - Doyon Management Services, LLC Amendment 0001, the amendment corrects the following: Email title should read: RE: ACTION - Request for Proposal - N4008526R0151, Design Build – Provide full repairs to Building 1372, Coddington Point (CP), referred to as Ripley Hall. – Naval Station Newport, Newport, RI Attachment 08 Site Visit Instructions was updated Pictures can be requested via Pre Proposal Inquiries and provided by NAVFAC personnel Amendment 0002, the amendment updates the following: Proposal Due Date Extended to 29 JUNE 2026 2:00PM EST. The PIEE solicitation module and SAM.GOV opportunities site will reflect the updated proposal due date. Incorporate updated Bid schedule, “Attachment 05 – Bid Schedule Rev 1” Incorporate: PI Responses 1372 NAPS Record Drawings (filename: 1372 NAPS_Record Drawings.pdf) 1372 NAPS Red-lined As-Builts (file name: 1372 NAPS_red-lined asbuilts.pdf) 1372 Roof Info and Warranty (file name: Bldg. 1372_Submittal 011_Roof Close Out A.pdf) 1372 NAPS Upgrade - Supplemental Technical Requirements for Amendment (filename: B1372 NAPS Upgrade_Technical Supplemental Requirements.pdf) Direct Digital Controls (DDC) Supplement Fire Alarm Supplement CAC Lenel Supplement Sketch 01 – Fire Alarm / PA Panel Locations Revised Attachment 2 – Thermostat and Controller pathways Supplemental Site Photos
Classification
Place of Performance
Contracting Office
Contacts