AI Summary
Description
The contractor shall supply twelve (12) 150,000 lbs. (75 ton) industrial work horses and six (6) 150,000 lbs. (75ton) per specifications in Section 3.0. Shipping shall be included with the price. The contractor shall deliver the Industrial Work Horses to NFPC.
Classification
Place of Performance
Contracting Office
Contacts