AI Summary
Description
The Mission and Installation Contracting Command Center Fort Bragg MICC Center FB has a continuing requirement from the US Army Reserve Command USARC United States Army Western Hemisphere Command USAWHC Headquarters to provide customized service solutions to reconfigure existing office cubicles. This has been an ongoing requirement for USAWHC and USARC over the last few years. The contractor must therefore build on existing cubical configurations. All components procured under the anticipated contract shall therefore match the existing Steelcase Brand Montage Configuration Solutions currently in place for USAWHC and USARC. The primary objective of this requirement is to provide Steelcase brand name, Montage Style cubicle components and office cubicle installation reconfiguration services for the HQ USAWHC and USARC. Specifically, this primary objective includes the following tasks. The Contractor shall have the capability to procure Steelcase brand cubical components from the Montage Catalogue Technical Exhibit 4. Contractor shall assume responsibility for the delivery, protection, documentation and storage of these cubical components prior to installation. The Contractor shall assemble and install all procured office cubical components IAW the manufacturers instructions/warranty provisions and specifications given by the customer. Contractor shall furnish qualified personnel with the tools, materials and safety equipment required to perform the required assemblies. Please provide Pricing Catalogue or Pricing Guide specific to Steelcase Montague with submittal.
Classification
Place of Performance
Contracting Office
Contacts