Questions and answers for 36C25626Q1005 Original RFQ states 2 rooms. Addendum 02 has clarification on just one room. Please confirm it is both rooms. Larger room is about 66x36, smaller room is about 36x36 The project includes both rooms identified in the PWS. The dimensions shown in the solicitation are approximate and for reference only; the contractor shall field-verify all dimensions and quantities. 2) Confirm light natural wood-color in smaller room, and dark blue in larger room Follow all directions listed in the PWS. Final shades, patterns, and manufacturers will be confirmed via samples/submittals and CO approval prior to the ordering of materials. Awarded vendor should not order materials prior to written submittal approval. All samples provided are at the vendor s cost and will not be returned and destroyed after contract award. No costs of any quotes, measurement samples or site visits are reimbursable. 3)Confirm if base is 4" rubber wall base, or continuous sheet vinyl base 4" up wall. Provide the wall base specified in the PWS and applicable flooring/base specifications. 4) If sheet vinyl base, is the base in smaller room to match wood-like color? Provide the wall base specified in the PWS and applicable flooring/base specifications. 5) Can both rooms be done at the same time? The contractor shall include a schedule showing how the work will be completed. The Government will coordinate access as needed. 6) Will all equipment be moved prior to flooring scope? Equipment, furniture, and related clearances will be coordinated prior to mobilization in accordance with the work schedule. The vendor will be responsible for coordinating/confirming that equipment is removed prior to mobilization. 7) Will desk and its power be removed prior to flooring scope? Refer to question 6. 8) Can contractor truck and trailer be parked directly outside the accessible doors? Contractor personnel shall park in appropriately designated parking areas. 9) The current PSC Z2JZ is for alterations of buildings and we feel the code S214 would be more appropriate and inline with the provided DOL Wage Rates. Would you consider changing the PSC code? Upon review the code will be amended to S214. 10) The solicitation documents include VAAR Clause 852.219-73, indicating a Total Set-Aside for Certified Service-Disabled Veteran-Owned Small Businesses. However, the SAM.gov listing shows no set-aside designation. Please confirm whether this procurement is a Total SDVOSB Set-Aside or unrestricted. 100% SDVOSB Set-aside. 11)Question 2 Applicable Wage Law: The solicitation is coded under PSC Z2JZ (Repair or Alteration of Miscellaneous Buildings) but includes Service Contract Act Wage Determination WD 2015-5233. Please confirm whether offerors should price labor under the Davis-Bacon Act or the attached SCA wage determination. See question 9. 12) Fitness Center Dimensions: The Performance Work Statement states the Fitness Center area as 845 ft x 36 ft = 30,420 SF. Please con…
Classification
Contracting Office
Contacts