AI Summary
Description
AMD 0002- SEE SF30 SUMMARY OF CHANGES AMD 0001- THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE A CHANGE TO THE BIDDER INQUIRY KEY. The U.S. Army Corps of Engineers (USACE) Savannah District is issuing a Request for Qualifications-Phase 1 Solicitation for W912HN25RA018 for Project Number: 108466, Design Build to Budget, Bldg. 24401, Fort Gordon, GA. Product Service Code: Y1FC – Construction of Troop Housing Facilities Type of Set-Aside & NAICS: Unrestricted, Full and Open, 236220 Construction Magnitude: In accordance with DFARS 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $100,000,000. Proposal Due Date: 30 September 2025 via the Procurement Integrated Enterprise Environment (PIEE) Solicitation module Period of Performance: The period of performance including all options is anticipated to be 1,000 Calendar Days after the issuance of the notice to proceed. Description of Work: Design and construct an approximately 45,000 GSF; 94-bed barracks utilizing the Design-Build Done Right process in Ft Eisenhower, GA. The barracks will be designed to meet the AMC/HQIMCOM directed Army UEPH Standards to accommodate 94 soldiers. Project will include demolition of existing structure and replacing on the same site. Project will also include access control, intrusion detection system and infrastructure for future CCTV, EMCS, fire protection and alarm systems, cybersecurity measures, sustainability and energy measures and 100% redundancy for heating and cooling. The project will also include sitework, utilities, lighting, paving, parking, sidewalks, storm and sewer systems, gutters and curbs, information systems, landscaping and signage. Acquisition Approach: This acquisition will be awarded in accordance with (IAW) FAR Subpart 36.3 - Two-Phase Design-Build Selection Procedures. Qualification proposals will be evaluated in Phase1 to determine which offers will submit proposals for Phase 2. The government will select three (3) of the most highly qualified offerors and request those offerors submit Phase 2 proposals. Only those selected offerors are authorized to submit Phase 2 proposals. All responsible sources may submit a Phase 1 proposal. In Phase 2, -offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements and the solicitation does not change the terms of the contract or provide for any price adjustment by the government. Those unsuccessful Offerors who provide a responsive proposal in Phase 2 will be paid a stipend up to $150,000 to offset the costs associated with the preparation of required conceptual designs. Factors-REQUEST FOR QUALIFICATION (PHASE1) FACTOR 1 -Proof of Bonding Capacity FACTOR 2 – Past Performance FACTOR 3 – Designer Experience This solicitation describes the methodology to be used in the evaluation of Phase 1 proposals and provides instructions for the submission of the Phase 1 proposals. Instructions for submission of Phase 2 proposal will be provided in th…
Classification
Place of Performance
Contracting Office
Contacts