AI Summary
Description
THIS IS A SOURCES SOUGHT NOTICE . THIS NOTICE IS ISSUED FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A SOLICITATION OR INVITATION FOR OFFERORS TO SUBMIT QUALIFICATION DOCUMENTS OR PROPOSALS. SHOULD THIS REQUIREMENT MOVE FORWARD, A SYNOPSIS OF THE PROPOSED CONTRACT ACTION WILL BE POSTED AT A LATER DATE PROVIDING INSTRUCTIONS FOR OFFERORS TO RESPOND TO THIS OPPORTUNITY. Please only respond to this sources sought notice if you are seriously interested and if your company is capable of performing the corresponding work required. The Federal Bureau of Prisons (FBOP), Federal Correctional Complex (FCC) Allenwood anticipates the issuance of a solicitation for the award of a firm-fixed-price construction contract for a project titled Replace HVAC Units at FCC Allenwood located at Route 15, 2 miles North of Allenwood, Allenwood, PA 17810. The Federal Bureau of Prisons (FBOP), FCC Allenwood, located at Route 15, 2 miles North of Allenwood, Allenwood, PA 17810, seeks to award a single contract to a qualified and licensed contractor to provide all labor, materials, and engineering services to include the submittal of a comprehensive 100% Design Package for FBOP approval, encompassing technical material specifications for the following; 1. Contractor qualified technicians to demolish and properly dispose : a. One (1) existing 30-ton and one (1) existing 50-ton package HVAC unit to include indoor air handler units (AHU's), outdoor condensers, & return fans. Contractor is required to disconnect and lock-out existing electrical to existing units. b. Existing ductwork shall remain. 2. Contractor qualified technicians to furnish and install : a. One (1) new 30-ton and one (1) new 50-ton HVAC unit to include outdoor condensers, indoor AHUs, and return fans. The new units shall be of similar make, model, and capacity of those being removed. b. The condensers and air handlers are to be installed on the existing concrete pads with correctly sized isolators. If the existing pads are not large enough to accommodate the new units, the contractor is responsible for extending the pads to accommodate the new units. c. Final duct connections to the unit shall have flex duct connections. d. Install new condensate drain piping to nearest approved drain. e. Reconnection of existing electrical system that is compatible with new units. f. Install new outdoor disconnects (possibly indoor). g. Install new copper line sets: 1. Pressure test, 300 PSI for 24-hours. 2. Triple evac to 500 microns h. Install new variable frequency drives (VFDs), duct smoke detectors, smoke dampers, economizer dampers, and all other applicable control devices. All controls to be tied into the Automated Logic control system. 3. All ductwork construction, installation, and pressure/leakage testing (if included) to comply with latest SMACNA ( Sheet Metal and Air Conditioning Contractors' National Association ) standards. 4. All areas and existing mechanical systems/infrastructure within the building are ea…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)