AI Summary
Description
The Regional Maintenance Center at Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) is conducting market research to determine industry capability and interest in performing the maintenance, repair, and preservation of YON-322. Work will be accomplished at the Contractor's facility. The Government is seeking responses from sources that can perform the following work. Geographical Area of consideration: To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA. YON-322 • Length: 199 FT • Width: 54 FT • Height: 15 FT • Age: 21 YRS • Hull Type: Steel • Draft: 3 FT • Full Displacement: 2,848 L Tons • Light Load: 706 L Tons Scope Overview: Coordinate with the Contracting Officer, via the Contracting Officer's Representative (COR) to deliver the vessel from Manchester Fuel Depot to the Contractor's facility. Dock, wash, and clean exterior surfaces of the vessel upon docking. Replace zinc anodes on hull / Skegs. Accomplish preservation to Underwater Hull, Freeboard, Main deck, Deck house, Cargo piping and all deck fittings. Clean non-skid located Main deck, Deck house top and Cargo deck. Remove, clean and install Rubber fenders. Modify existing Piping eliminate Aft Flow Meter and insert spool. Accomplish Ultrasonic test measurement and visual inspection of the hull, Main deck, Cargo deck and Deck house top. Open, Clean, Pump and maintain clean and dry each tank/void. Inspect tanks/voids for defects. Replace Navigational lights with new LED light fixtures. Refresh Exhaust Muffler for Yanmar and Main Engine. Replace Solar Panels. Remove Antenna Support Modification. Perform Storage Locker modifications. Replace Fuel Oil Tank Piping. Replace and Calibrate Cargo Tank Level Indicator's (TLI's). Perform Preliminary Air test of Tanks/voids/Steel Fendering and Skegs. Accomplish a final closure inspection of each tank/void upon completion of all work installing new gaskets and fasteners. Perform Final Air Test of Tanks/voids/Steel Fendering and Skegs. Accomplish repair, replace gaskets, and adjust watertight hatches and doors. Accomplish Cargo Pump Diesel and Diesel generator maintenance and repair. Undock the vessel. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the COR. Calibration of TLI's, shall be conducted at Contractor's facility after fuel on load. YON-322 Prime Period of Performance: Estimated June 2027 through August 2027 What/Where to Submit: Interested companies should submit, on company letterhead, a notice of interest including the name, telephone number, mailing address, and e-mail address of one point of contact. Please hand or digitally sign your letter of interest and e-mail it to the Government contacts listed belo…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)