Description
SOURCES SOUGHT Fo rThree Rivers Region (7 Lakes) MATOC Posted 06 March 2026 Responses Due: 26 March 2026This is a SOURCES SOUGHT notice to gather industry interest and information with respect to a potential five-year indefinite delivery/Indefinite Quantity (IDIQ) design/build multiple award task order contract (MATOC) at the seven lakes areas within the Three Rivers Region. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow-up information requests. Respondents will not be notified of the results of the evaluation. Not responding to this notice does not preclude participation in any future procurement. The U.S. Army Corps of Engineers ? Southwestern Fort Worth District has been tasked to solicit a five-year multiple award construction contract for multi-discipline construction work, to include design, with project values up to $1,000,000 to support the Three Rivers seven lakes region. The MATOC will provide a vehicle for execution of a broad range of maintenance; repair and minor/heavy construction performed under a design/build or bid/build process. For the purpose of this Request for Information (RFI), the work to be performed under the MATOC will be within the North American Industry Classification System (NAICS) codes as follows: Sector 23 - Construction, Subsection 236 - Construction of Buildings size standard $45 Million. Contractors will be expected to accomplish a wide variety of individual construction projects, ranging from construct only up to full 100% Design/Build, renovation, and additions/upgrades, along with specific work in hazardous material survey/abatement, heating/ventilation/air conditioning, electrical, mechanical, and other major trades. In-house design capability or ready access to design capability is a must for projects under the MATOC. Possible construction activities may include, but are not limited to the following: (a) Road work activities may include the following: Removal and replacement of road surfaces, HMAC overlay, chip seal, slurry seal, substrate work, striping, wheel stop removal and replacement, drainage culvert removal and installation, culvert safety end treatments, guardrail demolition, repair and replacement, etc. (b) Concrete work may include the following: Flatwork, structural, foundations, boat ramps, concrete leveling, flowable fill, concrete road edges, concrete paving, concrete barrier delivery and placement (Jersey barriers), concrete delineators, etc. (c) Recreation area work may include the following: Park sign removal and replacement, picnic shelter construction, cooker removal and installation, fire ring removal and installation, lantern post removal and installation, impact area materials (deliver, spread, and compact), RV shelter construction, restrooms (renovation, demolition, and construction), playground removal and …
Contracting Office
Contacts