AI Summary
Description
AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 17, 2026. The solicitation has a technical issue with posting full amendments. Once the issue is resolved all responses to questions will be posted. Original: Project 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award…
Classification
Place of Performance
Contracting Office
Contacts