AI Summary
Description
INTRODUCTION Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from prospective offerors to support the design, fabrication, testing, and inspection of a pressure vessel for the Central Facilities Area (CFA) Carbon-based Fuels Capability. PROCESS BEA is seeking qualified firms to compete for the design/build contract in support of the CFA-686 CO2 Storage Vessel (V-738). As determined by BEA, responders to this EOI may receive a Request for Proposal (RFP) that will require detailed technical and price proposals be provided for evaluation and ranking under a source selection process. Interested firms are advised that RFP release and the source selection/award decision timeline will be communicated following review of submitted EOIs. The contract award type will be firm-fixed price. Per the project schedule, all durations are After Receipt of Order (ARO): ASME Code design and analysis (3 weeks), shop fabrication drawings (4 weeks), WPS/PQR submittal and approval (3 weeks), complete shop fabrication including cleaning (25 weeks), install heating elements and insulate vessel (26 weeks), ship vessel to INL (27 weeks), and submission of the final Code Data Report, as-built drawings, and all other deliverables (28 weeks). PROJECT DESCRIPTION The vessel will be designed, fabricated, inspected, and delivered for the INL Central Facilities Area (CFA) Carbon-based Fuels Capability (CFA-686). The vessel, designated V-738, is a 200 cubic foot ASME BPVC Section VIII, Division 1 code "U" stamped pressure vessel for gaseous CO2 service, with a design pressure of 1,800 psig and a design temperature range of -40°F to 500°F. The vessel is a horizontal configuration with two saddle supports spaced 16 feet apart, a 36-inch inner diameter, minimum 2-inch shell thickness, minimum 1-inch hemispherical head thickness, and an overall shell length of 26 feet 3-1/2 inches. The vessel includes seven nozzles (inlet, outlet, five inspection ports, a low point drain, a pressure relief nozzle, and two instrumentation ports), nine band heating elements (3.6 kW total) to maintain the vessel above 150°F, and Foamglas (or equivalent) insulation with protective aluminum sheathing. The vessel will be installed outdoors at INL in a high desert environment, with an altitude of 4,900 ft, ambient temperatures ranging from -40°F to 100°F, and exposure to wind, blowing sand, dust, snow, and frost. The vessel must be designed for static, seismic, and wind loading in accordance with IBC 2024, ASCE 7-10, and ACI 318-19, and fabricated from 304/304L stainless steel pressure boundary materials. Specific fabrication drawings, foundation details, and design calculations will be provided to qualified offerors as part of the RFP process. PROCESS This EOI is the first step in identifying interested and qualified vendors for fut…
Place of Performance
Contracting Office
Contacts
Attachments (1)