AI Summary
Description
This is a Combined Synopsis/Solicitation for Commercial Items prepared in accordance with the format in FAR SUBPART 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This Combined Synopsis/Solicitation 1333MK26Q0123 constitutes a Request for Quotation (RFQ) which Incorporates provisions and clauses in effect through the Federal Acquisition Circular 2026-01. The National Oceanic Atmospheric Administration (NOAA), Office of Marine & Aviation Operations (OMAO), Marine Operation Center (MOC), This requisition is to provide NOAA Ship Oscar Elton Sette (R 335) with Sewage tank cleaning and pipes snaked to clear a blockage The solicitation is being issued as a total small business set-aside. The associated NAICS code is 336611 with a size standard of 1300 Employees. The SCA is applicable under Wage Determination No.: 2015-5689 Quotes will be evaluated in accordance with FAR 52.212-2 Evaluation-Commercial Products and Commercial Services (Nov 2021). Your response, technical, and pricing should be forwarded electronically to the Contracting Specialist via email no later than the date and time specified above. When responding, please include the Requisition number in the subject line. To verify receipt of your response, please contact me either by email or phone. Christopher Baker Christopher.Baker@noaa.gov FIRM FIXED PRICE CLIN 0001 – BASE PoP SCOPE Objective: Clean the Sewage Holding Tank of the NOAA SHIP Oscar Elton Sette. Note: There’s something in the tank that is blocking the suction lines. Snaking the suction line only temporarily pushes the blockage back into the sewage holding tank. REFERENCE DOCUMENTS None GOVERNMENT FURNISHED MATERIAL (GFM) None GENERAL REQUIREMENTS Pump out and properly dispose of all remaining sewage, water, sludge, and debris. For bidding purposes, the sewage tank is approximately 5,000 gallons. It will be pumped down as empty as possible with residual sewage remaining. Open, ventilate, and clean safe for entry of workers, and close tank. High-pressure water wash tanks, including sides, overhead, bottom, and all internals, to remove slime and light scale. Light scraping may be necessary, but take care not to damage coating systems. Pump out, remove, and properly dispose of all residual water and debris. Post a gas-free certificate, issued by a Marine Chemist, near the access to each tank, and provide a copy of each certificate to the COR. After all work is completed inside the tanks and accepted by the COR, close each opened tank. Immediately prior to closing each tank, the COR or designate will inspect the tanks' interior to verify that all rags and other residual debris are removed. QUALITY ASSURANCE Walk through with Ship’s Engineers to verify tanks are free and clear of debris after completion of tank cleaning. During the filling process, recheck manhole covers and vents f…
Classification
Contracting Office
Contacts