AI Summary
Description
STATEMENT OF WORK 1. Utility Relocation Services – Bern, Switzerland Aug 2026 2. STATEMENT OF WORK for RELOCATION AND EXTENSION OF POTABLE WATER AND SEWER LINES – EAST OF CHANCERY United States Embassy Bern, Switzerland Aug 2026 3. 1.1 PROJECT DATA A. Project Title: Addition/Relocation of Potable Water and Sewer Lines – East of Chancery, in Support of Temporary Construction Offices, Bern, Switzerland B. Project Location: Primary work location is the area east of the U.S. Embassy (Chancery Building) in Bern, where temporary construction offices will be sited during the related Selective Improvement Project (SIP) construction period. 4. 1.2 PROJECT SCOPE A. The U.S. Government leases the Chancery in Bern. The U.S. Government requires the addition and/or relocation of existing potable water lines and sanitary sewer lines to a new alignment east of the Chancery to serve temporary construction offices to be installed in that area in support of the Bern SIP construction effort to be carried out by the Department of State Bureau of Overseas Building Operations (OBO) using an American Contractor. B. Contractor is responsible for providing complete surveying, design, and installation/relocation services necessary to meet the requirements of this contract within established schedules. Services may include, but are not limited to: field survey, utility mapping, civil/site engineering, plumbing design, trenching and excavation coordination, pipe material specification, connection detailing, backflow prevention, and restoration of disturbed surfaces. Services must comply with Swiss, American, and International standards and codes as listed below. C. Contractor shall provide the following types of services: 1. Type A. Survey and Field Verification. Contractor shall conduct a field survey to verify existing conditions, including the location, depth, size, material, and condition of existing potable water and sewer lines in the vicinity of the Chancery. Contractor shall verify dimensions and required length of extension/relocation to reach the temporary construction office area east of the Chancery. Contractor shall document existing utility tie-in points, elevations, and any conflicts with other subsurface utilities or structures. Contractor shall prepare a survey report with findings, including a utility location plan (plan and profile drawings) and photographic documentation. 2. Type B. Design Services. In accordance with Swiss and American plumbing, civil, and life safety codes and standards, Contractor shall prepare design and construction documents (statements of work, drawings, and specifications) for the addition and/or relocation of potable water and sewer lines to the east Chancery temporary construction office location. Design shall include pipe sizing, material selection, slope/grade calculations for gravity sewer lines, pressure calculations for potable water lines, connection details to existing mains, and any required backflow prevention or cross-…
Place of Performance
Contracting Office
Contacts
Attachments (1)