AI Summary
Description
Questions & Answers: Roughly when will approval decision be made and when would installation begin? An award decision will be made promptly after the solicitation closes. We anticipate an award before September 30, 2026. Would you like to include inspections, winterization, and spring start ups with the quote? No, we do not need that included. It was stated that for utility locating to contact the PM/COR 14 days prior to needing marked, however, the SOW also states to be ready to begin work 10 days after approval. Are we able to change that to begin work once utilizes are marked? For liability reasons we will not be digging, trenching, plowing, boring, ect until all utilities are marked. Yes. When NTP is issued I will create a work order to have the utilities marked and I will ensure that all utilities are marked within the same week. All valve lids must be lockable, does it matter the size of each valve box? Preferably 15”x26”x15” or equivalent. We will cut and remove the Bermuda grass prior to disturbing, however, any damage done to the Bermuda that may need replacing will need to be planted/sodded in the spring/summer once and potential frost damage has passed, is it ok to come back to replace Bermuda? Yes. If it doesn't go past the period of performance date. The period of performance is changing to 240. The quote must call out the change in the period of performance based on the real performance date. Is there a preferred brand of product or are we free to use any? Rainbird or Hunter will work. Are we liable if we hit a utility that was not marked after begin told we are good to begin digging? No, the government will be liable. SOW state an audit is required after installation, typically an audit is a handful of areas/zones, do you want a full system audit included? Yes a full system audit . Do you want a backflow enclosure included? Yes, lockable as well . Are we able to have materials delivered and stored close by on site? Ex: PVC pipe on pallets. Yes, we have a lay down area. Is the parking lot area in front of the flag poles a good staging area for trencher trailer/trucks/ect? No. Parking lot six will be the area for parking. If work is delayed due to weather, base operations, ect, will that affect our deadline date? The contract Period of Performance may be adjusted to account for timing issues beyond the Contractor's or the Government's control. Are we able to work weekends? SOW stated Mon-Fri 7-5. Weekend work will be permitted for the main water tie in only. There is no mention of a rain sensor, would you like one included? Yes we would like to include the rain sensor. Are there certain days/hours that we are not allowed to excavate/trench/directional bore? No . There is no mention of grounding. Irrigation systems can be struck by lightning, would you like to include grounding? This would include a grounding rod near the controller and a copper wire ran to it. Yes Which version of prevailing wage rates is being used? Refer to…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (5)