AI Summary
Description
This project includes demolition of existing Water Tanks 1511 and 1512 and construction of new Water Tank 1513 and associated piping. It also includes replacement of the two existing duty Pumps #1 and #2 in Building 152. Additional detail is available in the attached document.
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)