Back to contract actions
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
April 6, 2026
End Date
July 3, 2026
NAICS
PSC
J998
Transactions (5)
| Date | Mod # | Obligation |
|---|---|---|
| Mar 17, 2026 | 0 | +$1,107,707 |
| Apr 22, 2026 | P00001 | +$0 |
| Apr 27, 2026 | P00002 | +$0 |
| Jun 18, 2026 | P00003 | +$0 |
| Jul 22, 2026 | P00004 | -$25,350 |
Subcontractors 5$462,972 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI KRK2MLBEL7J7 Accomplish the requirements for work item: 514-11-001 addition of air conditioning to supply department (sd) storerooms number no. 3 and no. 4 install. wde to accomplish paragraph 3.8; 631-10-001 helicopter crash rescue locker overhead lagging replacement and preserve. wde to accomplish paragraphs 3.1-3.1.2; 631-11-001 fan room preserve. wde to accomplish paragraphs 3.1, 3.3-3.3.1; and 635-11-001 lagging and insulation replacement accomplish. wde to accomplish paragraphs 3.1-3.3.1 onboard the uss john basilone (ddg-122) serm-055-26 cmav located at mayport naval station. pop: 04/06/2026 - 07/03/2026. please see the attached quote: uss john basilone for reference and exceptions. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. wde is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $89,800 |
UEI WA3QAGQERSN5 Accomplish the requirements for work item: 407-11-001 bonding and grounding strap replace. waveforce to accomplish paragraphs 3.1 - 3.3; 438-00-001 dead end cable removal accomplish. waveforce to accomplish paragraphs 3.1 - 3.2; 493-11-001 unclassified edge switch rack, cat 5e cable replacement accomplish. waveforce to accomplish paragraphs 3.1 - 3.2; and 514-11-001 addition of air conditioning to supply department (sd) storerooms number no. 3 and no. 4 install. waveforce to accomplish reference 2.4. onboard the uss john basilone (ddg-122) serm-055-26 cmav located at mayport naval station. pop: 04/06/2026 - 07/03/2026. please see the attached estimate: 7083 dated february 02, 2026 for reference and exceptions. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. waveforce is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $46,328 |
UEI Q8S4HKFTVCC9 Accomplish the requirements for work item: 593-11-001 vacuum, collection, holding and transfer (vcht) piping system chemical clean. qed to accomplish paragraphs 3.1- 3.5 only - exception to paragraph 3.1.1. onboard the uss john basilone (ddg-122) serm-055-26 cmav located at mayport naval station. pop: 04/06/2026 - 07/03/2026. please see the attached quote: qedtsfl-26-005 dated january 22, 2026 for reference and exceptions. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. qed is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $85,763 |
UEI FDDEB3EW3JA4 Accomplish the requirements for work item: 514-11-001 addition of air conditioning to supply department (sd) storerooms number no. 3 and no. 4 install. jcw to accomplish paragraphs 3.1.1,3.1.2.1-3.1.5; and 652-11-001 medical examination table replacement accomplish. jcw to accomplish paragraphs 3.1-3.4 onboard the uss john basilone (ddg-122) serm-055-26 cmav located at mayport naval station. pop: 04/06/2026 - 07/03/2026. please see the attached quote: jcw-005 dated february 02, 2026 for reference and exceptions. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. jcw is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $85,200 |
UEI DDNELLWJ1DB1 Accomplish the requirements for work item: 514-11-001 addition of air conditioning to supply department (sd) storerooms number no. 3 and no. 4 install. amc to accomplish paragraphs 3.3 - 3.3.2; 593-11-001 vacuum, collection, holding and transfer (vcht) piping system chemical clean. amc to accomplish paragraphs 3.1 - 3.5; and 998-41-001 hazardous waste produced on naval vessel control. amc to accomplish paragraphs 3.1-3.6.2 onboard the uss john basilone (ddg-122) serm-055-26 cmav located at mayport naval station. pop: 04/06/2026 - 07/03/2026. please see the attached quote: serm-055-26 dated february 10, 2026 for reference and exceptions. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. amc is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $155,880 |