AI Summary
AI summary · generated 11/24/2026 · verify on SAM.gov
Description
PRE-SOLICITATION SYNOPSIS NOTICE ONLY: THE SOLICITATION WILL BE AVAILABLE ON OR ABOUT NOVEMBER 30, 2026 AT HTTPS://SAM.GOV/. THE SOLICITATION NUMBER IS N6945027R0008, FOR THE DESIGN-BID-BUILD (DBB) CONSTRUCTION PROJECT P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR TRAINING FACILITY AT KEESLER AIR FORCE BASE (AFB), BILOXI, MISSISSIPPI PROJECT TITLE : DESIGN BID BUILD (DBB) CONSTRUCTION PROJECT, P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR TRAINING FACILITY AT KEESLER AIR FORCE BASE (AFB), BILOXI, MISSISSIPPI PSC: Y1BA (Construction of Air Traffic Control Towers) NAICS: 236220 – Commercial and Institutional Building Construction THIS IS NOT A REQUEST FOR PROPOSALS OR AN INVITATION FOR BID. NO CONTRACT WILL BE AWARDED FROM THIS ANNOUNCEMENT. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation currently available. In order to protect the procurement integrity of any future procurement that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made. Description : This acquisition may result in the award of a Design Bid Build (DBB) Firm Fixed Price (FFP) Construction contract of an Air Traffic Control Tower and Flight Simulator Training Facility at Keesler AFB, Mississippi. This project will construct a new Air Traffic Control Tower and adjacent Flight Simulator Facility. Project includes all utilities, site improvements, pavements, elevator, backup generator, and all necessary work for a complete and usable facility. Project will comply with Department of Defense Antiterrorism/Force Protection requirements per Unified Facilities Criteria 4-010-01 and Unified Facilities Criteria 3-600-01. A Bid Option is included for the demolition of Buildings 4209 and 4230, to include site grading and the installation of a security fence. Demolition in this bid option to only occur after the new Air Traffic Control Tower is complete. The estimated Period of Performance is 1,219 calendar days. The best value continuum source selection process to be used for this acquisition is the Best Value Tradeoff process as described in FAR 15.103-1. The Best Value Tradeoff process is appropriate and permits evaluation of proposals based on price competition, technical merit, confidence assessment and other factors; permits impartial and comprehensive evaluation of offeror proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government. A sources sought notice was posted to sam.gov on October 27, 2026, requesting small business industry interest and capability statements. Based on responses from the notice it was determined that the requirement should be issued as Full and Open…
Classification
Place of Performance
Contracting Office
Contacts