AI Summary
AI summary · generated 11/24/2026 · verify on SAM.gov
Description
The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for the Chesapeake and Delaware (C and D) Canal Building Replacement Project. The Chesapeake and Delaware or Canal connects the Delaware River to the Chesapeake Bay and Port of Baltimore. The canal is maintained from a field office located in Chesapeake City Maryland. This office consists of multiple buildings and shops that are essential to the continued operation of the canal. Several of these building have reached the end of their lifecycle and need to be replaced. This project will include the demolition and consolidation of the mechanics shop, bridge shop and storage buildings. A new building will be constructed to sever as a replacement of the buildings that are being removed. The building will be located along the east side of the project site. The building dimensions will be 60 feet x 150 feet with a clear ceiling height of 20 feet. The building will have a gable roof with the ridge running parallel to the length of the building. A pre- engineered metal building with tapered columns will be used. The columns will be enclosed with steel stud framing and gypsum board in the office areas. Vehicle and workshop areas will have propane fired heating. Office areas will be provided with air conditioning. The electrical service will be upgraded if necessary to provide power to the new building. The building will be connected into backup power from the existing diesel generator. Work will consist of the following activities: A.) The project scope includes all work required to design and construct a 9,000 square foot maintenance building in accordance with the Request for Proposal documents including the demolition of the four existing buildings and propane storage tank currently located at the site. Utilities serving each of the buildings being demolished must be demolished to the extents defined in section 02 41 00 Demolition. Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the Offeror is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule. The intent of the Government is to emphasize the placement of funds into functional/operational requirements. Materials and methods must reflect this by choosing the most economical type of construction allowed by code for this occupancy/project. B.) The maintenance building must be provided with Heating, Ventilation, and Air Conditioning (HVAC), electrical, communications, fire protection, life safety, plumbing systems, waste oil storage, and compressed air systems. C.) A 3,000 square foot storage shed must be designed and constructed at the location identified on the site plan. The shed design must include power and lighting. D.) The scope of work also includes civil site work consisting of site paving, installation …
Classification
Place of Performance
Contracting Office
Contacts