Description of Requirement The United States Coast Guard (USCG), Director of Operational Logistics (DOL) / Contracting Activity, announces its intent to negotiate and award a sole-source contract modification/task order to Design and Production, Inc. (D&P) , located at 7110 Rainwater Place, Lorton, VA 22079. This requirement encompasses the final phase of comprehensive professional design refinement, fabrication, delivery, systems integration, and on-site installation services necessary to achieve full operational readiness for the permanent exhibitions of the National Coast Guard Museum (NCGM) prior to its scheduled grand opening in 2027. The scope of work under this action includes, but is not limited to: Exhibit Fabrication: Precision fabrication and final assembly of specialized, museum-grade physical exhibits, interactive displays, and artifact mounts. Archival Case Integration & Security: Structural fabrication, microclimate control integration, and multi-tier physical and electronic security systems integration across seventy (70) custom archival display cases. Graphics & Digital Production: Final production and high-resolution imaging of environmental typography, historical imagery, and large-format digital artwork. Integrated Site Installation & Coordination: Comprehensive on-site installation management, including specialized theatrical and conservation exhibit lighting, structured low-voltage signal cabling, audiovisual network backbone integration, and critical structural alignment with the base-building prime architectural and engineering design. 2. Statutory Authority and Rationale for Sole-Source Award The statutory authority permitting this sole-source acquisition is 41 U.S.C. § 3304(a)(1) , as implemented by FAR 6.302-1(a)(2)(iii) : "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements" for the continuation of highly specialized services. Key Justification Factors: Unacceptable Delays to Mission Schedule: Design and Production, Inc. has served as the sole prime contractor responsible for the preceding conceptual, schematic, and detailed engineering phases of the NCGM exhibits. A transition to any other vendor at this critical milestone would necessitate a re-baselining of engineering drawings, building interfaces, and vendor tooling, causing an estimated 12- to 18-month operational delay . This delay would directly jeopardize the congressionally and publicly recognized 2027 opening timeline. Substantial Duplication of Cost: Onboarding a new contractor would require complete engineering re-validation, structural interface re-certification, project management re-mobilization, and redesign of seventy (70) integrated archival display cases. The Government estimates that this transition would result in $5,000,000 to $7,000,000 in duplicated costs that cannot be expected to be recovered through competitive procurement. Integrated Technical Liability & Proprietary Fit: D&P possesses pree…